- Time to start clearing and grubbing operations.
- Clearing and grubbing operations were performed by Angled Engineering's owner Nick Konopacki, P.E. and a CAT D4 bulldozer.
- Time for clean up.
- Ready for fill! The building site took over 6,500 cy of fill. Angled Engineering performed and managed fill operations to ensure proper compaction was met.
- Dumping pad was created with select crushed material for the 435 dump trucks to back up onto and dump the fill over the edge.
- 175' retaining wall was designed and constructed by Angled Engineering to achieve the home's 1st floor final elevation. Final wall height reached nearly 8' tall.
- Wall is complete and ready for footings!